Lift Station Winter Maintenance: 8 Checks for Crews

Lift Station Winter Maintenance: 8 Checks for Wastewater Crews

Most winter lift station problems start with the controls, heating systems and backup power rather than the pumps themselves. These components should be checked before the first deep freeze. A float stuck in hardened grease or a failed alarm battery can lead to an emergency call-out, wastewater backup or overflow. This guide covers eight maintenance checks wastewater crews should perform before and during winter, what to document during each inspection, and how to maintain a complete service history for every station.

Wastewater technician using a tablet at an outdoor sewer lift station in winter, next to an open wet well hatch and control panel

Quick Answer: Lift Station Winter Checks

CheckWhen
Floats and level sensorsClean and test during every visit; inspect more frequently at stations with recurring grease buildup
Alarms and call-outsFollow your utility’s testing schedule and test before forecast cold snaps or storms
Pump amps, run hours and startsRecord readings during every visit and compare pumps at the same station
Heater, ventilation and exposed pipingInspect before the first freeze and during routine visits
Backup power and bypass planTest according to manufacturer and utility schedules; verify fuel levels before winter
Check and isolation valvesInspect and exercise according to the preventive maintenance schedule
Wet well cleaningFollow a scheduled cleaning frequency and inspect after high-flow events
Access after stormsInspect after every snow or ice storm

Why Do Lift Stations Need Extra Attention in Winter?

Lift stations are often unmanned and spread across multiple locations, which means equipment problems may go unnoticed until an alarm is triggered. Winter weather increases the risk of equipment failures and service interruptions.

  • Grease hardens in cold water and can cause floats and level sensors to stick or malfunction.
  • Ice storms can interrupt electrical service, making reliable backup power and alarm notifications critical.
  • Snow and ice restrict station access, delaying inspections and emergency repairs at remote locations.
  • Thaws and rain on snow increase wastewater flows, placing additional demands on pumps and other station equipment.

Emergency repairs can cost three to more than ten times as much as planned maintenance (University of Tennessee RMC, 2020, via our 2026 maintenance statistics). Discovering a stuck float during freezing conditions can result in an emergency service call or wastewater overflow that could have been prevented through routine inspections.

1. How do you keep lift station floats from sticking in winter?

Clean floats and level sensors during every inspection, because grease buildup can harden in cold water and prevent floats from operating properly. Check that each float moves freely and that its cable is not tangled, damaged or worn. Test float operation according to your standard operating procedures (SOPs) and verify that the pumps and alarms respond correctly. For transducers and bubbler systems, compare the instrument reading with the actual wet well level. Perform inspections from the top of the wet well. Never enter a wet well except under an approved confined space entry program.

2. How often should you test lift station alarms?

Test high-level and power-failure alarms according to your utility’s schedule, and verify their operation before forecast cold snaps or storms. A warning light on the control panel does not confirm that the notification system is working. Verify that alarms are transmitted successfully to the on-call phone or designated personnel. Inspect dialer and telemetry backup batteries, since cold temperatures can reduce battery performance. Review and update the on-call contact list before holiday periods.

3. What pump readings should crews record at each visit?

Record motor amperage, run hours and pump starts during every visit. Changes in these readings can help identify developing equipment problems before a pump fails. Compare readings between pumps at the same station to identify differences in operating performance. Rising amperage can indicate ragging, increased pump load or mechanical wear. An increase in pump starts may point to a leaking check valve, float problems or other control issues. Listen for unusual noise or vibration and inspect mechanical seal leak indicators according to the manufacturer’s instructions. Our pump maintenance checklist covers additional inspection points.

4. How do you keep a lift station from freezing?

Verify that the station heater is operating properly, the building or enclosure is sealed, and exposed equipment and piping are protected from freezing temperatures. Test the heater and thermostat before the first freeze. Make sure ventilation operates as designed because proper ventilation is also important for worker safety. Insulate or heat exposed gauges, pressure lines and hose bibs where required. Inspect door seals, hatch covers and other openings that could allow cold air or water into the station.

5. How should you check backup power at a lift station before winter?

Test generators and verify portable generator connections and bypass procedures according to manufacturer and utility schedules. Check fuel levels before winter weather arrives. For permanently installed generators, inspect the block heater, battery and fuel system. Have qualified personnel test the transfer switch and verify that the generator can support the station’s required electrical load. For stations that rely on portable generators, confirm which unit is assigned to each location, verify that connections are compatible, and keep the bypass pumping plan accessible to on-call crews.

6. What valve checks matter at a lift station?

Inspect and exercise check valves and isolation valves according to the preventive maintenance schedule to verify that they operate properly when needed. Listen for check valve slam and check for signs of backflow between pump cycles. Exercise isolation valves to prevent them from seizing and make sure they can be operated when a pump needs to be removed for service. Inspect air release valves on the force main according to the manufacturer’s instructions.

7. How often should a lift station wet well be cleaned?

Clean the wet well according to a scheduled maintenance frequency and after high-flow events to control grease buildup, rags and other accumulated material. Document the amount of material removed during each cleaning. Use these records to adjust the cleaning frequency based on actual conditions at each station. If a station repeatedly develops heavy grease buildup, share that information with the personnel responsible for grease control and outreach to businesses in the collection system.

8. What should crews check at lift stations after a snow or ice storm?

Inspect every lift station after a snow or ice storm, prioritizing locations that experienced power outages or generated alarms. Clear snow and ice from access points, hatches and control panels. Check for active alarms, compare pump run hours with previous readings, and verify that backup generators operated as expected. Check fuel levels and refuel generators when necessary. Document inspection findings, equipment conditions and any required repairs on the work order so the next crew has an accurate maintenance record.

How Does a CMMS Help With Lift Station Maintenance?

A CMMS helps wastewater crews schedule lift station inspections, document equipment readings, manage repairs and maintain a complete maintenance history for every station. Winter increases the risk of freezing, power interruptions and equipment problems. A consistent preventive maintenance schedule helps crews identify and address issues before they lead to emergency service calls or wastewater overflows.

  • Before winter: Schedule preventive maintenance for floats, alarms, heaters, backup power systems and valves at each station before freezing temperatures arrive.
  • During each visit: Record pump readings, including amperage, run hours and starts, on the work order. Create follow-up work orders for problems that require repair or additional inspection.
  • Over time: Review work order history and equipment records to identify recurring pump problems, determine which stations need more frequent inspections, and track spare floats, check valve components and heater elements to help ensure replacement parts are available when needed.

eWorkOrders provides tools to manage preventive maintenance, work orders and spare parts for utility and public works crews. The preventive maintenance software and spare parts inventory help organize station maintenance. Crews can also access maintenance information and update work orders from a phone or tablet through mobile CMMS in the browser. For additional planning resources, visit the free eWorkOrders maintenance checklist library, which includes checklists for pumps and other equipment.

Frequently Asked Questions

What lift station maintenance should be completed before winter?

Before the first freeze, crews should clean and test floats and level sensors, verify high-level and power-failure alarms, inspect station heaters and test backup power systems. Check valves, isolation valves and exposed piping should also be inspected. Address any equipment problems before freezing temperatures make maintenance and repairs more difficult.

Which lift stations should be prioritized before a winter storm?

Prioritize stations with a history of winter problems, locations without reliable backup power or remote alarm notifications, and stations with outstanding work orders involving pumps, heaters or alarm systems. Address work that reduces the risk of equipment failure and wastewater overflow first. Make sure necessary parts, equipment and contractors are available before severe weather arrives.

What information should maintenance crews record during a lift station inspection?

Record pump amperage, run hours, starts, wet well conditions, alarm test results and any unusual equipment noise, vibration or operating conditions. Compare readings with previous inspections to identify changes in equipment performance. Maintaining these records helps crews identify developing problems and determine which stations require additional maintenance.

How should maintenance crews handle problems found during winter inspections?

Document each problem in a work order with an assigned priority and due date. This ensures that repairs are tracked rather than relying on someone to remember them. Complete repairs that can be performed safely during winter conditions. If a repair must be postponed, schedule it for an appropriate time and keep the work order open until the work is completed.

Final Thoughts

Keeping lift stations operational through winter starts with completing routine inspections before freezing temperatures arrive. Clean floats, tested alarms, functioning heaters and properly maintained backup generators reduce the risk of unexpected equipment problems and emergency call-outs. Document inspection findings during every visit and use the maintenance history to identify recurring problems and plan future work.

Sources
  • Blache, K., “Twenty Reasons to Stop Firefighting,” University of Tennessee Reliability and Maintainability Center, 2020. rmc.utk.edu

Standards and guidance change. Follow the current edition your authority having jurisdiction requires and the manufacturer’s instructions for your equipment.

Disclaimer

This article is general information for maintenance teams, not engineering, legal or safety advice. Always follow the equipment manufacturer’s instructions, your organization’s safety procedures, and the codes and requirements of your authority having jurisdiction, and use qualified professionals for work that calls for them.

About the author: Janet Jaquis is Marketing Director at eWorkOrders, where she writes about maintenance strategy, asset reliability, and CMMS software for maintenance and facility teams.

Janet Jaquis
Janet Jaquis Marketing Director | CMMS Software Specialist

Janet Jaquis is a CMMS software specialist with over 8 years at eWorkOrders, where she develops educational content, technical guides, whitepapers, and implementation resources for maintenance management professionals. Her work covers preventive maintenance, work order management, asset reliability, inventory and spare parts, mobile maintenance, and CMMS implementation across manufacturing, healthcare, government, food and beverage, and facilities operations. Janet's content is grounded in customer testimonials, case studies, industry research, and ongoing engagement with the eWorkOrders product team and customer base. Prior to eWorkOrders, she spent her career at AT&T in enterprise technology, working on the development and launch of AT&T WorldNet — one of the first major commercial internet services — and serving as Product Marketing Manager for AT&T WorldNet and AT&T Satellite Services. She holds a degree in Marketing and previously held PMP (Project Management Professional) certification.